About Winton North Solar Farm

Winton North Solar Farm is a 150MW solar farm with 200MWh battery. It is located between the townships of Glenrowan and Benalla in Victoria. Marble started developing the project in late 2018 and it is in the process of securing a development approval from the Victorian Department of Planning.

Marble expects to start construction in 2022, feeding electricity into the network by late 2023.

Project details

State

Victoria

Powered by Marble Energy

40,000 homes

Project area

300 hectares

Tonnes of CO² emissions saved

Up to 170,000/year

Capacity

150MW

Jobs created

250+

Storage

100MW/200MWh

Project Timeline

Development

Late 2018–Present

Construction

2022

Operational

Late 2023

Winton North Solar Farm